Interested in the results?
See for yourself.

Walgreens + Kroger Express
Walgreens needed to update 50 stores to incorporate fresh grocery and improved options allowing families to build full meals from Walgreens grocery.
Read moreMajor Renovation Programme
A rental portfolio owner has numerous homes in need of varying levels of exterior, interior and infrastructure repairs.
Read moreVyStar Credit Union
VyStar, a Florida based Credit Union, needed a single firm to manage an expansion into Georgia and South Carolina.
Read moreMake Rent Ready
A rental portfolio owner was struggling to get their homes rent ready quickly enough to maximize income potential.
Read moreEmergency Housing Repair
A housing client with multiple damaged homes during a hurricane required immediate survey and assessment of damages.
Read moreMilitary Housing
A military housing client needs to repair 18 buildings at their site, and each building is three storeys and has 24 units.
Read moreStarbucks
Starbucks operates thousands of stores across the U.S. and Canada which is a difficult and complex responsibility. New builds, site acquisitions and remodels all have unique challenges and require different approaches to complete the programme.
Read moreWOW Carwash
WOW Carwash has spent the last five years building six car wash sites and needed a partner who could help them scale and go to market quicker. They also needed support evaluating potential sites and help working with municipalities to obtain the appropriate permits.
Read moreBP
BP policy states that every five years, sites must go through a structural inspection. The site inspections generally consist of survey work for the canopies that cover the fuel stations.
Read moreWalgreens
Walgreens needed to refresh 8,000 stores following a company reorganisation that had significantly reduced its development staff.
Read moreChase Bank
Chase Bank needed to update 260 sites across the country. Each site needed to follow ADA guidelines and go through a redesign that matched its own innovation upgrade initiatives.
Read moreJCPenney
JCPenney is converting Sephora branded retail spaces within their department stores into a JCPenney branded cosmetics retail space.
Read moreSkyline Scaffold
Increased successful bids.New Standardised bid process. CHALLENGE Skyline Scaffold is a subcontractor that provides scaffolding for contractors working on all building types. The project bid process is a crucial component of Skyline Scaffold’s business, but prior to working with Sevan, they didn’t have a standardised template for collecting bid information. This led to bidding inconsistencies across …
Read moreWalgreens Disaster Recovery
Dozens of mobile pharmacies.3 Week timeline for execution CHALLENGE After hurricanes slammed the United States and Puerto Rico, many pharmacies were destroyed—leaving people suffering without access to critical prescription medications. SOLUTION Walgreens and Sevan came up with the idaea of a mobile Rx unit—a pop-up structure that can be easily transported and assembled in one day. The …
Walgreens Disaster Recovery Read More »
Read moreImmunotek
30 Conditions assessment surveys.4-5 Week completion timeline Challenge ImmunoTek operates 13 plasma donation centres across the United States and is aiming to build more locations in the next few years. They needed a partner who could survey and collect information from each potential new site. They then needed that partner to compile the data into actionable information …
Read moreCarbon Health
241 Site surveys and Revit models.2-3 Week deliverable timeline. Challenge Carbon Health wanted to to expand their new build clinics and assess mergers and acquisitions across the country. They needed help assessing property and organising data in a timely manner to allow their real estate team to decide on what sites they would move forward with. Carbon …
Read moreLuxottica
80 completed sites.205 lease reviews.250+ millwork installations. CHALLENGE In 2021, Luxottica started remodelling North American stores for various brands including LensCrafters, Sunglass Hut, Ray Ban, Target Optical and Pearle Vision. The remodel includes complex millwork installation that follows very specific brand standards. Before beginning each project, all Luxottica locations go through a lease review to ensure their …
Read moreVillageMD & Walgreens
527 Surveys and virtual tours.2-Day timeline for site deliverables. CHALLENGE VillageMD is partnering with Walgreens to build clinics in existing stores across the country. VillageMD and Walgreens needed precon surveys to document building systems and existing condition assessments. They also needed postcon surveys to document the updates made within one week of each clinic’s grand …
VillageMD & Walgreens Read More »
Read moreMahogany Whataburger
22-Week restaurant build.Customized delivery support solution. CHALLENGE Mahogany Whataburger has a development agreement with corporate that requires them to deliver multiple restaurants on a year-over-year (YOY) basis. They needed a partner to create a comprehensive delivery support solution and building their first restaurant in Athens, Alabama. This restaurant needed to be built within six months …
Mahogany Whataburger Read More »
Read moreMahogany Whataburger PSP
3-7 Restaurants per year timeline. Full-service solutions throughout the development lifecycle. CHALLENGE Mahogany Whataburger is a new operator within the Whataburger system. They need a partner to provide a full-service solution throughout the program lifecycle to help them expand their footprint of restaurants across the state of Alabama by 2027. SOLUTION Sevan and Mahogany Whataburger …
Mahogany Whataburger PSP Read More »
Read moreWalgreens Rite-Aid Acquisition Programme
1900 Store acquisition program. 3.5 Year completion timeline. CHALLENGE Walgreens acquired over 1900 Rite Aid locations and needed to assess each site to determine which locations would be integrated into their site portfolio and which locations would be sold to optimize their site footprint. Walgreens needed a partner who could manage remodel and renovation projects …
Walgreens Rite-Aid Acquisition Programme Read More »
Read moreWalgreens Safety Compliance
Walgreens partnered with Sevan to identify safety and compliance deficiencies after discovering a trend in potentially unsafe conditions leading to increased risk on their projects.
Read moreMotor Fuel Group EV Station Installations
4 EV station remodels2 Standalone EV stations10-12 Week installation timeline CHALLENGE Motor Fuel Group (MFG) operates over 900 sites across the U.K. Electric vehicles are becoming increasingly popular and as a result, MFG is adding EV chargers to some of their sites. Adding EV charging requires updates to their power grid. Supplying the power …
Motor Fuel Group EV Station Installations Read More »
Read more7-Eleven Hot Food Station Installation
25-Site remodel programmeProcess documentation for more efficient remodels CHALLENGE 7-Eleven needed to remodel 25 convenience stores to incorporate food equipment into the design of those sites. They needed a partner who could manage the programme lifecycle and focus on inventory reconciliation, contractor sourcing and utility infrastructure changes. SOLUTION Sevan worked closely with 7-Eleven to …
7-Eleven Hot Food Station Installation Read More »
Read more7-Eleven Acquisition Remodel Programme
21-Site rebrand programme 100% of sites completed on time 30% Increase in sales CHALLENGE 7-Eleven acquired several convenience sites and needed to do a rebrand and minor refresh to update each location to fit their branding. They had 2-3 months to order equipment and reconcile inventory, and each site needed to be completed in …
7-Eleven Acquisition Remodel Programme Read More »
Read more7-Eleven Tank Replacement Programme
250+ Tank replacements and upgrades Developed a programme plan to efficiently complete each project CHALLENGE Every year, 7-Eleven budgets for tank replacements, fuel equipment and compliance upgrades for select fuelling stations across the country. To complete each project, they need help managing the replacements and upgrades, working with multiple authorities having jurisdiction (AHJs) across …
7-Eleven Tank Replacement Programme Read More »
Read moreMcDonald’s
McDonald’s selected Sevan to programme manage renovations of numerous Chicago-area spaces – including the iconic landmark Rock-N-Roll McDonald’s at 600 N. Clark Street.
Read moreMcDonald’s
650 sites in least modernised market; largest remodel programme in McDonald’s history.
Read moreWalgreens
Walgreens acquired 200+ Duane Reade locations in New York City and needed to integrate them to align with Walgreens’ branding and merchandising standards.
Read moreWalgreens
Walgreen’s Advanced Rooftop Unit (RTU) process involves selective decommissioning and replacement of older HVAC rooftop units with new high efficiency heating and cooling equipment.
Read moreWalgreens – Volta
Walgreens and Volta teamed up to provide EV Charging stations at 49 Walgreens locations in the Pacific Northwest. Neither Walgreens nor Volta had sufficient programme management capacity to deliver the initiative successfully.
Read moreWalmart Health
Walmart was preparing to launch industry-leading integrated health centers in just a few months. They were looking for scalable, innovative development solutions to launch their first of several sites.
Read moreChipotle
Chipotle noticed an increase in online order demand in 2018 and needed to renovate their restaurants to accommodate these orders. Chipotle found that the best way to upgrade their facilities to accept the online order was to create Digital Make Lines (DMLs) in the kitchen
Read morePopeyes
Popeyes is undergoing a rebrand and is looking to refresh its restaurants across the U.S. They needed a partner who could help them create a new restaurant design prototype at their flagship site in Metairie, LA, and manage the remodel programme lifecycle.
Read moreCorvias
Corvias needs to repair 18 buildings at their Fort Bragg site. Each building is three stories and has 24 units.
Read moreHCA
HCA wanted to expand its Free-Standing Emergency Room (FSER) programme and needed a partner who understood the healthcare industry. HCA chose Sevan to act as their owner’s representative to handle all FSER site builds across the country.
Read moreJiffy Lube
In 2020, Jiffy Lube set out to expand its store presence for the first time in 22 years. In total, 60 new sites will be built over the course of 2-3 years. Resource and labor scarcity has led to inflated bid costs, making it more expensive for Jiffy Lube to build its sites.
Read moreCKE Restaurants
CKE (Carl’s Jr.) leveraged Sevan’s design expertise for new restaurant to meet the challenges of the Los Angeles Green Building Code (LAGBC) to reduce the building’s energy and water use, reduce waste, and reduce the carbon footprint.
Read more7-Eleven
7-Eleven board members chose 5 sites in San Diego to go through a remodel programme to convert them into flagship stores.
Read moreSunoco
Sevan provides Sunoco with programme management for new build locations, marketing initiatives in support of interior equipment upgrades, exterior image upgrades, interior remodels, fueling upgrades
Read moreKroger
Sevan provided civil engineering, zoning and permitting services for the design and entitlements for new retail petroleum sites at existing Kroger grocery stores and stand-alone sites.
Read moreBRR
BRR Architecture was contracted by a major retailer to remodel and build a warehouse facility in California. They needed help with the zoning and permitting process. In addition to needing the appropriate permits, BRR needed help navigating the permit approval process during a pandemic in LA county, which has notoriously long permit wait times due to vast number of yearly requests
Read moreAlbertsons
Albertsons needed to implement a strategic ADA remediation programme in which 2,000+ stores were evaluated and updated.
Read more
Work with us today.
Contact us