7-Eleven
7-Eleven board members chose 5 sites in San Diego to go through a remodel programme to convert them into flagship stores.
Read more7-Eleven
25-Site remodel program Process documentation for more efficient remodels CHALLENGE 7-Eleven needed to remodel 25 convenience stores to incorporate food equipment into the design of those sites. They needed a partner who could manage the program lifecycle and focus on inventory reconciliation, contractor sourcing and utility infrastructure changes. SOLUTION Sevan worked closely with 7-Eleven […]
Read more7-Eleven Acquisition Remodel Programme
21-Site rebrand programme 100% of sites completed on time 30% Increase in sales CHALLENGE 7-Eleven acquired several convenience sites and needed to do a rebrand and minor refresh to update each location to fit their branding. They had 2-3 months to order equipment and reconcile inventory, and each site needed to be completed in […]
Read more7-Eleven Tank Replacement Programme
250+ Tank replacements and upgrades Developed a programme plan to efficiently complete each project CHALLENGE Every year, 7-Eleven budgets for tank replacements, fuel equipment and compliance upgrades for select fuelling stations across the country. To complete each project, they need help managing the replacements and upgrades, working with multiple authorities having jurisdiction (AHJs) across […]
Read moreAlbertsons
Albertsons needed to implement a strategic ADA remediation programme in which 2,000+ stores were evaluated and updated.
Read moreBP
BP policy states that every five years, sites must go through a structural inspection. The site inspections generally consist of survey work for the canopies that cover the fuel stations.
Read moreBRR
BRR Architecture was contracted by a major retailer to remodel and build a warehouse facility in California. They needed help with the zoning and permitting process. In addition to needing the appropriate permits, BRR needed help navigating the permit approval process during a pandemic in LA county, which has notoriously long permit wait times due to vast number of yearly requests
Read moreCarbon Health
240 Site assessments and Revit models.2-3 Week deliverable timeline. Challenge Carbon Health wanted to to expand their new build clinics and assess mergers and acquisitions across the country. They needed help assessing property and organizing data in a timely manner to allow their real estate team to decide on what sites they would move forward […]
Read moreChase Bank
Chase Bank needed to update 260 sites across the country. Each site needed to follow ADA guidelines and go through a redesign that matched its own innovation upgrade initiatives.
Read moreChipotle
Chipotle noticed an increase in online order demand in 2018 and needed to renovate their restaurants to accommodate these orders. Chipotle found that the best way to upgrade their facilities to accept the online order was to create Digital Make Lines (DMLs) in the kitchen
Read moreCKE Restaurants
CKE (Carl’s Jr.) leveraged Sevan’s design expertise for new restaurant to meet the challenges of the Los Angeles Green Building Code (LAGBC) to reduce the building’s energy and water use, reduce waste, and reduce the carbon footprint.
Read moreCollaborative PM
Optimized payment processes. Reduced time spent managing invoices. CHALLENGE An energy client was encountering challenges due to its heavy reliance on Google Sheets. This led to duplicated data entry, overlapping workflows, unreliable information and miscommunication in operations and financial tracking. SOLUTION After partnering with Sevan to implement a new collaborative project management software solution, the […]
Read moreCorvias
Corvias needs to repair 18 buildings at their Fort Bragg site. Each building is three stories and has 24 units.
Read moreDobbie Development Group
Zeal for Living sought an experienced firm aligned with their core values to assist in creating a neighborhood centered on wellness, health and community in Sherman, TX.
Read moreEmergency Housing
A housing client with multiple damaged homes during a hurricane required immediate survey and assessment of damages.
Read moreHarvest Energy
Full site rebuild after extensive fires. CHALLENGE An extensive fire rendered the service station beyond repair, requiring the complete demolition of the current buildings, forecourt pump arrangement and ancillary facilities. The site was within a sensitive conservation area, so it needed a sympathetic rebuild to retain its architectural heritage. It was a small restricted site layout […]
Read moreHarvest Energy
7-Week expedited programme.Shop remained open with minimal disruption. CHALLENGE The existing site was an operational BP petrol filling station with a single-storey flat roof building and three fuel dispensers. Since it was a busy service station, there was limited space for redevelopment work, and the shop and forecourt had to remain open. SOLUTION Wyeth designed and […]
Read moreHCA
HCA wanted to expand its Free-Standing Emergency Room (FSER) programme and needed a partner who understood the healthcare industry. HCA chose Sevan to act as their owner’s representative to handle all FSER site builds across the country.
Read moreImmunotek
30 Conditions assessments.4-5 Week completion timeline. Challenge ImmunoTek operates 13 plasma donation centers across the United States and is aiming to build more locations in the next few years. They needed a partner who could assess and collect information from each potential new site. They then needed that partner to compile the data into actionable […]
Read moreImproved Org Platform
Enhanced reporting and accountability. Optimized company-wide operations. CHALLENGE A design and construction firm had numerous departments operating in isolation, hindering essential collaboration. The absence of a single source of truth further heightened the issues, resulted in inefficiencies and caused scalability issues. SOLUTION Leveraging Sevan’s Technology & Data Analytics Team, the client established an intuitive and […]
Read moreJCPenney
JCPenney is converting Sephora branded retail spaces within their department stores into a JCPenney branded cosmetics retail space.
Read moreJCPenney
JCPenney identified 100 stores needing interior and exterior remodels based on capital, profitability and store conditions.
Read moreJiffy Lube
In 2020, Jiffy Lube set out to expand its store presence for the first time in 22 years. In total, 60 new sites will be built over the course of 2-3 years. Resource and labor scarcity has led to inflated bid costs, making it more expensive for Jiffy Lube to build its sites.
Read moreKroger
Sevan provided civil engineering, zoning and permitting services for the design and entitlements for new retail petroleum sites at existing Kroger grocery stores and stand-alone sites.
Read moreLuxottica
80 completed sites.205 lease reviews.250+ millwork installations. CHALLENGE In 2021, Luxottica started remodelling North American stores for various brands including LensCrafters, Sunglass Hut, Ray Ban, Target Optical and Pearle Vision. The remodel includes complex millwork installation that follows very specific brand standards. Before beginning each project, all Luxottica locations go through a lease review to ensure their […]
Read moreMahogany Whataburger
24-Week restaurant build.Customized delivery support solution. CHALLENGE Mahogany Whataburger has a development agreement with corporate that requires them to deliver multiple restaurants on a year-over-year (YOY) basis. They needed a partner to create a comprehensive delivery support solution and building their first restaurant in Athens, Alabama. This restaurant needed to be built within six months […]
Read moreMahogany Whataburger PSP
3-7 Restaurants per year timeline. Full-service solutions throughout the development lifecycle. CHALLENGE Mahogany Whataburger is a new operator within the Whataburger system. They need a partner to provide a full-service solution throughout the program lifecycle to help them expand their footprint of restaurants across the state of Alabama by 2027. SOLUTION Sevan and Mahogany Whataburger […]
Read moreMajor Renovation Programme
A rental portfolio owner has numerous homes in need of varying levels of exterior, interior and infrastructure repairs.
Read moreMake Rent Ready
A rental portfolio owner was struggling to get their homes rent ready quickly enough to maximize income potential.
Read moreMcDonald’s
650 sites in least modernised market; largest remodel programme in McDonald’s history.
Read moreMcDonald’s
McDonald’s selected Sevan to programme manage renovations of numerous Chicago-area spaces – including the iconic landmark Rock-N-Roll McDonald’s at 600 N. Clark Street.
Read moreMFG EV Stations
4 EV station remodels 2 Standalone EV stations 10-12 Week installation timeline CHALLENGE Motor Fuel Group (MFG) operates over 900 sites across the U.K. Electric vehicles are becoming increasingly popular and as a result, MFG is adding EV chargers to some of their sites. Adding EV charging requires updates to their power grid. Supplying […]
Read moreMilitary Housing
A military housing client needs to repair 18 buildings at their site, and each building is three storeys and has 24 units.
Read moreMotor Fuel Group
8 EV charging stations installed. Installed 3 new jet wash bays and equipment. CHALLENGE Before work had begun on the EV bay area, the site had been a typical verge area adjacent to a petrol filling station. It had poor vegetation and no landscaping between the site’s main entrance and exit. SOLUTION Wyeth performed a […]
Read moreMotor Fuel Group
First Burger King built in existing space.5-Week programme rollout. CHALLENGE Motor Fuel Group (MFG) wanted to incorporate a Burger King into its existing building. The space needed foundation work, fitting out a mezzanine floor for the plant and fitting out the Burger King and preparation areas. SOLUTION Since it was a small area to work […]
Read moreMotor Fuel Group
Increased site proposition. Innovative problem-solving for on-time opening. CHALLENGE The Motor Fuel Group (MFG) greenfield site was created as part of a development in a new industrial area. The initial planning application was refused but subsequently granted on appeal. This led to knock-on effects as subsequent changes requested by the client required planning permission. The […]
Read moreMotor Fuel Group
5 EV charging bays installed.Station remained open with minimal disruption. CHALLENGE Before work began, the Motor Fuel Group (MFG) site contained a single-storey sales building and forecourt equipped with six pump islands with below ground fills and vents. There were also six customer parking spaces and car care facilities. There was pressure to keep the […]
Read moreMotor Fuel Group
New build development with added revenue opportunities.Improved station performance. CHALLENGE Motor Fuel Group (MFG) needed a new build development for a new store, EV charging, forecourt, pumps and valet. The site was small, which made it difficult at times to make progress. A few design alterations were needed throughout the build, primarily with the heavy […]
Read morePopeyes
Popeyes is undergoing a rebrand and is looking to refresh its restaurants across the U.S. They needed a partner who could help them create a new restaurant design prototype at their flagship site in Metairie, LA, and manage the remodel programme lifecycle.
Read moreSkyline Scaffold
Increased successful bids.New Standardised bid process. CHALLENGE Skyline Scaffold is a subcontractor that provides scaffolding for contractors working on all building types. The project bid process is a crucial component of Skyline Scaffold’s business, but prior to working with Sevan, they didn’t have a standardised template for collecting bid information. This led to bidding inconsistencies across […]
Read moreStarbucks
Starbucks operates thousands of stores across the U.S. and Canada which is a difficult and complex responsibility. New builds, site acquisitions and remodels all have unique challenges and require different approaches to complete the programme.
Read moreSunoco
Sevan provides Sunoco with programme management for new build locations, marketing initiatives in support of interior equipment upgrades, exterior image upgrades, interior remodels, fueling upgrades
Read moreVillageMD & Walgreens
530 assessments and virtual tours.2-Day timeline for site deliverables. CHALLENGE VillageMD is partnering with Walgreens to build clinics in existing stores across the country. VillageMD and Walgreens needed pre-con assessments to document building systems and existing condition assessments. They also needed post-con assessments to document the updates made within one week of each clinic’s grand […]
Read moreVyStar Credit Union
VyStar Credit Union sought an expert firm to oversee its expansion and development into the Atlanta and Savannah markets in Georgia.
Read moreVyStar Credit Union
VyStar, a Florida based Credit Union, needed a single firm to manage an expansion into Georgia and South Carolina.
Read moreWalgreens
Walgreens needed to refresh 8,000 stores following a company reorganisation that had significantly reduced its development staff.
Read moreWalgreens
1900 Store acquisition program. 3.5 Year completion timeline. CHALLENGE Walgreens acquired over 1900 Rite Aid locations and needed to assess each site to determine which locations would be integrated into their site portfolio and which locations would be sold to optimize their site footprint. Walgreens needed a partner who could manage remodel and renovation projects […]
Read moreWalgreens
Walgreen’s Advanced Rooftop Unit (RTU) process involves selective decommissioning and replacement of older HVAC rooftop units with new high efficiency heating and cooling equipment.
Read moreWalgreens
Walgreens acquired 200+ Duane Reade locations in New York City and needed to integrate them to align with Walgreens’ branding and merchandising standards.
Read moreWalgreens – Volta
Walgreens and Volta teamed up to provide EV Charging stations at 49 Walgreens locations in the Pacific Northwest. Neither Walgreens nor Volta had sufficient programme management capacity to deliver the initiative successfully.