Interested in the results?
See for yourself.

Motor Fuel Group
New build development with added revenue opportunities.Improved station performance. CHALLENGE Motor Fuel Group (MFG) needed a new build development for a new store, EV charging, forecourt, pumps and valet. The site was small, which made it difficult at times to make progress. A few design alterations were needed throughout the build, primarily with the heavy …
Read moreMotor Fuel Group
8 EV charging stations installed.New-to-industry site with Food-To-Go offering. CHALLENGE The site was a greenfield site comprised of a large plot of open land previously used in conjunction with Filton Airfield. SOLUTION Wyeth worked alongside a proactive main contractor to deliver the product successfully. The access road into the site included a bell-mouth entrance which …
Read moreMotor Fuel Group
First Burger King built in existing space.5-Week program rollout. CHALLENGE Motor Fuel Group (MFG) wanted to incorporate a Burger King into its existing building. The space needed foundation work, fitting out a mezzanine floor for the plant and fitting out the Burger King and preparation areas. SOLUTION Since it was a small area to work …
Read moreHarvest Energy
Full site rebuild after extensive fires. CHALLENGE An extensive fire rendered the service station beyond repair, requiring the complete demolition of the current buildings, forecourt pump arrangement and ancillary facilities. The site was within a sensitive conservation area, so it needed a sympathetic rebuild to retain its architectural heritage. It was a small restricted site layout …
Read moreHarvest Energy
7-Week expedited program.Shop remained open with minimal disruption. CHALLENGE The existing site was an operational BP petrol filling station with a single-story flat roof building and three fuel dispensers. Since it was a busy service station, there was limited space for redevelopment work, and the shop and forecourt had to remain open. SOLUTION Wyeth designed and …
Read moreMotor Fuel Group
5 EV charging bays installed.Station remained open with minimal disruption. CHALLENGE Before work began, the Motor Fuel Group (MFG) site contained a single-story sales building and forecourt equipped with six pump islands with below ground fills and vents. There were also six customer parking spaces and car care facilities. There was pressure to keep the …
Read moreMotor Fuel Group
Increased site proposition. Innovative problem-solving for on-time opening. CHALLENGE The Motor Fuel Group (MFG) greenfield site was created as part of a development in a new industrial area. The initial planning application was refused but subsequently granted on appeal. This led to knock-on effects as subsequent changes requested by the client required planning permission. The …
Read moreMotor Fuel Group
8 EV charging stations installed. Installed 3 new jet wash bays and equipment. CHALLENGE Before work had begun on the EV bay area, the site had been a typical verge area adjacent to a petrol filling station. It had poor vegetation and no landscaping between the site’s main entrance and exit. SOLUTION Wyeth performed a …
Read moreStreamlined Production
Streamlined production of bill of materials. Improved client operations. CHALLENGE A retail client was relying heavily on multiple independent Microsoft Access databases to produce bills of materials. This caused challenges with data integrity, repetitive work and inconsistent communication and outputs. SOLUTION Sevan partnered with the client to deliver an innovative and consolidated solution that harmonized …
Streamlined Production Read More »
Read moreAutomated Processing
Automated freight invoice management. Increased client efficiency. CHALLENGE A retail client was encountering challenges due to its heavy volume of freight invoices. This led to late approvals from the heavy manual effort to review and approve invoices. SOLUTION To address the challenges faced by the retail client, Sevan partnered with the client to implement an …
Automated Processing Read More »
Read moreImproved Org Platform
Enhanced reporting and accountability. Optimized company-wide operations. CHALLENGE A design and construction firm had numerous departments operating in isolation, hindering essential collaboration. The absence of a single source of truth further heightened the issues, resulted in inefficiencies and caused scalability issues. SOLUTION Leveraging Sevan’s Technology & Data Analytics Team, the client established an intuitive and …
Improved Org Platform Read More »
Read moreCollaborative PM
Optimized payment processes. Reduced time spent managing invoices. CHALLENGE An energy client was encountering challenges due to its heavy reliance on Google Sheets. This led to duplicated data entry, overlapping workflows, unreliable information and miscommunication in operations and financial tracking. SOLUTION After partnering with Sevan to implement a new collaborative project management software solution, the …
Read morePM Software
Decreased monthly financial rollovers. Boosted client confidence. CHALLENGE A high-end residential home building client relied on Excel spreadsheets for scheduling, budgeting and contact management. This caused challenges due to a lack of verified column formulas, which led to inaccuracies. SOLUTION After implementing a new work management software solution, the client achieved reliable data, a single …
Read moreWalgreens + Kroger
Walgreens needed to update 50 stores to incorporate fresh grocery and improved options allowing families to build full meals from Walgreens grocery.
Read moreVyStar Credit Union
VyStar, a Florida based Credit Union, needed a single firm to manage an expansion into Georgia and South Carolina.
Read moreHousing Renovations
A rental portfolio owner has numerous homes in need of varying levels of exterior, interior and infrastructure repairs.
Read moreMake Rent Ready
A rental portfolio owner was struggling to get their homes rent ready quickly enough to maximize income potential.
Read moreEmergency Housing
A housing client with multiple damaged homes during a hurricane required immediate survey and assessment of damages.
Read moreMilitary Housing
A military housing client needs to repair 18 buildings at their site, and each building is three stories and has 24 units.
Read moreStarbucks
Starbucks operates thousands of stores across the U.S. and Canada which is a difficult and complex responsibility. New builds, site acquisitions and remodels all have unique challenges and require different approaches to complete the project.
Read moreWOW Carwash
WOW Carwash has spent the last five years building six car wash sites and needed a partner who could help them scale and go to market quicker. They also needed support evaluating potential sites and help working with municipalities to obtain the appropriate permits.
Read moreBP
BP policy states that every five years, sites must go through a structural inspection. The site inspections generally consist of survey work for the canopies that cover the fuel stations.
Read moreWalgreens
Walgreens needed to refresh 8,000 stores following a company reorganization that had significantly reduced its development staff.
Read moreChase Bank
Chase Bank needed to update 260 sites across the country. Each site needed to follow ADA guidelines and go through a redesign that matched its own innovation upgrade initiatives.
Read moreJCPenney
JCPenney is converting Sephora branded retail spaces within their department stores into a JCPenney branded cosmetics retail space.
Read moreSkyline Scaffold
80 completed sites. 205 lease reviews. 250+ millwork installations CHALLENGE In 2021, Luxottica started remodeling North American stores for various brands including LensCrafters, Sunglass Hut, Ray Ban, Target Optical and Pearle Vision. The remodel includes complex millwork installation that follows very specific brand standards. Before beginning each project, all Luxottica locations go through a lease …
Read moreWalgreens
1900 Store acquisition program. 3.5 Year completion timeline. CHALLENGE Walgreens acquired over 1900 Rite Aid locations and needed to assess each site to determine which locations would be integrated into their site portfolio and which locations would be sold to optimize their site footprint. Walgreens needed a partner who could manage remodel and renovation projects …
Read moreImmunotek
30 Conditions assessment surveys. 4-5 Week completion timeline Challenge ImmunoTek operates 13 plasma donation centers across the United States and is aiming to build more locations in the next few years. They needed a partner who could survey and collect information from each potential new site. They then needed that partner to compile the data …
Read moreCarbon Health
240 Site surveys and Revit models.2-3 Week deliverable timeline. Challenge Carbon Health wanted to to expand their new build clinics and assess mergers and acquisitions across the country. They needed help assessing property and organizing data in a timely manner to allow their real estate team to decide on what sites they would move forward …
Read moreLuxottica
80 completed sites. 205 lease reviews. 250+ millwork installations. CHALLENGE In 2021, Luxottica started remodeling North American stores for various brands including LensCrafters, Sunglass Hut, Ray Ban, Target Optical and Pearle Vision. The remodel includes complex millwork installation that follows very specific brand standards. Before beginning each project, all Luxottica locations go through a lease …
Read moreVillageMD & Walgreens
530 Surveys and virtual tours.2-Day timeline for site deliverables. CHALLENGE VillageMD is partnering with Walgreens to build clinics in existing stores across the country. VillageMD and Walgreens needed precon surveys to document building systems and existing condition assessments. They also needed postcon surveys to document the updates made within one week of each clinic’s grand …
VillageMD & Walgreens Read More »
Read moreWhataburger
24-Week restaurant build. Customized delivery support solution. CHALLENGE Mahogany Whataburger has a development agreement with corporate that requires them to deliver multiple restaurants on a year-over-year (YOY) basis. They needed a partner to create a comprehensive delivery support solution and building their first restaurant in Athens, Alabama. This restaurant needed to be built within six …
Read moreWhataburger
3-7 Restaurants per year timeline. Full-service solutions throughout the development lifecycle. CHALLENGE Mahogany Whataburger is a new operator within the Whataburger system. They need a partner to provide a full-service solution throughout the program lifecycle to help them expand their footprint of restaurants across the state of Alabama by 2027. SOLUTION Sevan and Mahogany Whataburger …
Read moreWalgreens + Rite-Aid
1900 Store acquisition program. 3.5 Year completion timeline. CHALLENGE Walgreens acquired over 1,900 Rite Aid locations and needed to assess each site to determine which locations would be integrated into their site portfolio and which locations would be sold to optimize their site footprint. Walgreens needed a partner who could manage remodel and renovation projects …
Walgreens + Rite-Aid Read More »
Read moreWalgreens
Walgreens partnered with Sevan to identify safety and compliance deficiencies after discovering a trend in potentially unsafe conditions leading to increased risk on their projects.
Read moreMFG EV Stations
4 EV station remodels 2 Standalone EV stations 10-12 Week installation timeline CHALLENGE Motor Fuel Group (MFG) operates over 900 sites across the U.K. Electric vehicles are becoming increasingly popular and as a result, MFG is adding EV chargers to some of their sites. Adding EV charging requires updates to their power grid. Supplying …
Read more7-Eleven
25-Site remodel program Process documentation for more efficient remodels CHALLENGE 7-Eleven needed to remodel 25 convenience stores to incorporate food equipment into the design of those sites. They needed a partner who could manage the program lifecycle and focus on inventory reconciliation, contractor sourcing and utility infrastructure changes. SOLUTION Sevan worked closely with 7-Eleven …
Read more7-Eleven
21-Site rebrand program 100% of sites completed on time 30% Increase in sales CHALLENGE 7-Eleven acquired several convenience sites and needed to do a rebrand and minor refresh to update each location to fit their branding. They had 2-3 months to order equipment and reconcile inventory, and each site needed to be completed in …
Read more7-Eleven
250+ Tank replacements and upgrades Developed a program plan to efficiently complete each project CHALLENGE Every year, 7-Eleven budgets for tank replacements, fuel equipment and compliance upgrades for select fueling stations across the country. To complete each project, they need help managing the replacements and upgrades, working with multiple authorities having jurisdiction (AHJs) across …
Read moreMcDonald’s
McDonald’s selected Sevan to project manage renovations of numerous Chicago-area spaces – including the iconic landmark Rock-N-Roll McDonald’s at 600 N. Clark Street.
Read moreMcDonald’s
650 sites in least modernized market; largest remodel program in McDonald’s history.
Read moreWalgreens
Walgreens acquired 200+ Duane Reade locations in New York City and needed to integrate them to align with Walgreens’ branding and merchandising standards.
Read moreWalgreens
Walgreen’s Advanced Rooftop Unit (RTU) process involves selective decommissioning and replacement of older HVAC rooftop units with new high efficiency heating and cooling equipment.
Read moreWalgreens + Volta
Walgreens and Volta teamed up to provide EV Charging stations at 49 Walgreens locations in the Pacific Northwest. Neither Walgreens nor Volta had sufficient program management capacity to deliver the initiative successfully.
Read moreWalmart Health
Walmart was preparing to launch industry-leading integrated health centers in just a few months. They were looking for scalable, innovative development solutions to launch their first of several sites.
Read moreChipotle
Chipotle noticed an increase in online order demand in 2018 and needed to renovate their restaurants to accommodate these orders. Chipotle found that the best way to upgrade their facilities to accept the online order was to create Digital Make Lines (DMLs) in the kitchen
Read morePopeyes
Popeyes is undergoing a rebrand and is looking to refresh its restaurants across the U.S. They needed a partner who could help them create a new restaurant design prototype at their flagship site in Metairie, LA, and manage the remodel project lifecycle.
Read moreHCA
HCA wanted to expand its Free-Standing Emergency Room (FSER) program and needed a partner who understood the healthcare industry. HCA chose Sevan to act as their owner’s representative to handle all FSER site builds across the country.
Read moreJiffy Lube
In 2020, Jiffy Lube set out to expand its store presence for the first time in 22 years. In total, 60 new sites will be built over the course of 2-3 years. Resource and labor scarcity has led to inflated bid costs, making it more expensive for Jiffy Lube to build its sites.
Read moreCKE Restaurants
CKE (Carl’s Jr.) leveraged Sevan’s design expertise for new restaurant to meet the challenges of the Los Angeles Green Building Code (LAGBC) to reduce the building’s energy and water use, reduce waste, and reduce the carbon footprint.
Read more
Work with us today.
Contact us